golmud
- 网络格尔木;格尔木市;青海格尔木
golmud
golmud
格尔木
中国月份平均气温查询 - 中国天气 ... 高雄 Gaoxiong 格尔木 Golmud 广州 Guangzhou ...
格尔木市
目前本地时间 格尔木市(Golmud), 中国(China)目前不是夏时制时间 地理坐标 格尔木市 - 在线地图 在线Flash时钟由24TimeZone…
青海格尔木
从英文网站翻译中文地名,如何翻好?_geovindu... ... gengma= 云南耿马 golmud= 青海格尔木 gonggar= 四川贡嘎 ...
格尔木机场
格尔木机场名称:格尔木机场(GOLMUD) 机场类型:民用机场Golmud Airport :格尔木机场 中文名:格尔木机场 英文名:GOL…
购买
GORM戈尔牧户外旗舰店 --京东商城 ... 购买 Gorm/ 购买 Golmud/ ...
1
The method put forward in the paper can be applied to the operational optimization of Golmud-Lhasa Pipeline with floating tank process.
提出的方法可用于指导采用“旁接油罐”输送方式的格拉输油管道实际操作,使其达到工况最优。
2
When the night and early morning light shades, train reached the Golmud now, at an elevation of up to 3000 meters, cold.
当夜色褪去晨光初现时,列车到达格尔木,海拔上升到3000多米,气温骤降。
3
and Golmud from a desert into the local words, "even more than Xining prosperity " in a city of immigrants.
而格尔木则从一片荒漠变成了用当地话说“比西宁还要繁华”的移民城市。
4
Based on the transformation program of the Golmud-Lhasa pipeline, a study of the operational optimization was made.
根据格拉管道改造方案,以寻求最大输量为目标,对其进行了工况运行优化研究。
5
When the Sky Trainreaches Golmud at dawn, I feel dizzy.
傍晚火车到达格尔木时,我感觉头晕了。
6
Xining-Golmud Section is 834 km with 356 km to be double-tracked and the whole section will be electrified .
西宁至格尔木段全长834公里,其中356公里增建第二线,并对全线进行电气化建设。
7
Last August, Golmud was hit by a 6. 2 magnitude earthquake that destroyed dozens of homes but caused no deaths.
去年八月,格尔木市受到6.2级地震袭击,数十家房屋倒塌,但是没有人员伤亡。
8
The first section, from Beijing to Golmud in Qinghai Province, was completed in 1984.
1984年青藏铁路第一期工程-北京至青海格尔木段建成通车。
9
The 815 km section from Xining to Golmud in Qinghai opened to traffic in 1984.
该节从815公里西宁至格尔木青海通车于1984年。
10
Analysis of the Odor on the Steam Stripping Device for Sulfurous Sewage and Its Treatment Measures in Golmud Oil-extraction Plant
格尔木炼油厂含硫污水汽提装置臭源分析及处理办法
11
Study of the Operational Optimization of Batch Transportation in Golmud-Lhasa Pipeline
格拉管道顺序输送运行优化研究
12
Geological features of tectonic fracture and their hazard effects to Golmud-Lhasa railway across the Tibetan Plateau
青藏铁路沿线构造裂缝的地质特征及工程危害
13
Assessment on tectonic activity and divisions of engineering stability along the Golmud-Lhasa Railway
青藏铁路沿线构造活动性评价和工程稳定性区划
14
Numeric Simulation on Destructive Effect of Golmud- Lhasa Railway Resulting in Stick-Slip Movement of the Eastern Kunlun Fault
东昆仑断裂粘滑错动对青藏铁路变形效应的数值模拟
15
Practice of Secondary Anticorrosion Painting of Golmud-Lhasa Pipeline Pump Station Oil Tank
格拉管线泵站油罐第二次防腐涂漆实践
16
Reflection on the Cultural Resource Protection and Tourism Development in Golmud Area
格尔木地区文化资源保护与旅游发展思考
17
Pumping Station Technical Reform on Golmud-Lhasa Products Pipeline
格拉成品油管道泵站分输管道的改造
18
Research on Increasing Passing Capacity of Golmud-Lhasa Section of Qingzang Line
提高青藏线格拉段通过能力的研究
19
The Establishment of Yadong-Golmud Global Geoscience Transect GIS
中国亚东-格尔木地学断面GIS的初步建立
20
Current Stress Measurement and Structure Analysis of Golmud-Wudaoliang Region in Qinghai Province
青海格尔木-五道梁地区现今地应力测量结果及其构造分析